Just prior to completing the final revisions and additions to the last chapter of Everything Shuswap about the history of settlement, I rediscovered some material about the construction of the Canadian Pacific Railway (CPR) through the Shuswap in my history file cabinet. These papers were obtained during a visit to the CPR archives in Montreal back in 1988, when my focus was on local history. The information was significant enough to warrant including some excerpts.
The building of the CPR was key to British Columbia joining Confederation and it was an essential part of nation building for Canada. It was a monumental task to construct the railway through the mountains and over the many canyons and waterways, and much of it was accomplished with hand labour. William Cornelius Van Horne, who later became CPR president, was in charge of the project. There were two major contractors in B.C., Andrew Onderdonk in the west and James Ross in the east.
It was not until the summer of 1884 that work began on the section between Savona and Chase Creek under the supervision of Henry Cambie and to the east, by Major A. B. Rogers. In early September, Van Horne wrote a letter to the CPR directors outlining the status and estimated cost of the project:
“The section to Griffin Lake, at the summit of Eagle Pass (113 miles) is estimated to cost not more than an average of $16,000 per mile, making the average cost per mile from the west end of Kamloops Lake to Griffin Lake, a distance of 128 miles, $21,565 dollars per mile.”
A November 1, 1884 handwritten letter from Andrew Onderdonk, an American construction contractor for the railway, to W.C. Van Horne provided even more description:
“At Salmon River, I found seven gangs of Chinamen working on the fill, which will be finished in about 2 weeks. The work was well advanced. The bank is quite heavy, about 1½ miles long and in some cases 16 feet high. When this is done some of these Chinamen will work at a heavy earth cut all winter 8 miles west of Salmon River and the balance be sent to the rock work west of the Summit. Sinclair was building winter quarters for five gangs of white men to work on this rock and by this time I think the men have gone up being about through on the Kamloops Lake.
I found the two tunnels 3 and 8 miles west of Chicamose [Sicamous] well stocked with flint, powder and provisions sufficient to complete the tunnels with their approaches…..
Bray has three gangs of white men, all first class. I think his tunnels are sure to be finished in April.”
The book Van Horne’s Road by Omer Lavallée describes how there was a warehouse and store for the “Chinese” at the west end of Shuswap Lake, and a smaller store for the “whites” in Blind Bay. Once the excavation work was done and the bridges and trestles were completed, the actual laying of the track progressed quickly at the rate of one mile per day.
This book also provides some other interesting details:
“The hot and dry midsummer of 1885, which had so much trouble with forest fires in the Selkirks, produced the same effect in the Shuswap region. A stockpile of ties, estimated to number between 12,000 and 15,000 was completely consumed as the railway was being built eastward from Kamloops in July. As a result, when the railway was advancing over Notch Hill and even though new ties were being delivered to replace those lost, the supply was far behind the demand.
Major Rogers noted with dismay that only half the required number of ties were being placed in the track, in order not to impede tracklaying. Ties were thus laid on a 42-inch spacing, rather than the specified 21-inch spacing.
The delays in construction in the Selkirks in the summer of 1885 put Ross far behind schedule, and Onderdonk completed his section first. On September 28th, 1885, ran out of rails two miles west of the north fork of the Eagle River, on the west slope of Eagle pass. Ross’ forces were still 43 miles to the east, about five miles west of Albert Canyon.”
Onderdonk dismissed his employees on September 26, 1885, while Ross continued work until the last spike was driven on November 7th at Craigellachie.