The Louis Creek Industrial Park (LCIP) new water system project is now underway. District of Barriere CAO Colleen Hannigan reported at last Monday’s council meeting that Rivermist Excavation started work on the LCIP water system last week. The pump house excavation and staking have been prepared and some thrust blocks around the pump house have been poured. A number of lots have already been sold in the LCIP, the next step now is installing the water system as quickly as possible.
(District of Barriere photo)