To the editor,
I understand there is group that wants to have the tracks of the E&N removed and make a hiking and biking path.
I’m a retired mechanical engineer. Throughout my career I always worked on the KISS philosophy: keep it simple, stupid. Applying the principle to the quest to remove the rails and make a hiking/biking path, the solution is simple.
The standard railway gauge is four feet, eight and a half inches. Rather than take the tracks up, just make a path between the rails that are there now. To smooth out the bumps because of the ties’ spacings, just pave it (say one inch or put down pea gravel and compact).
Don’t wait for the tracks to be removed because doing that is a horrendous expense. Doing it this way is infinitely cheaper than removing the rails. Your path is already there.
Dave Baker, Nanaimo
READ ALSO: Nanaimo, Snuneymuxw, Snaw-Naw-As councillors join Island Corridor Foundation’s board
READ ALSO: Snaw-Naw-As First Nation calls for repurposing of E&N rail line
<hr width=”75%”>
The views and opinions expressed in this letter to the editor are those of the writer and do not reflect the views of Black Press or the Nanaimo News Bulletin.
Letters policy: Letters should be no longer than 250 words and will be edited. Preference is given to letters expressing an opinion on issues of local relevance or responding to items published in the News Bulletin. Include your address (it won’t be published) and a first name or two initials, and a surname. Unsigned letters or letters specifically addressing someone else will not be published.
Mail: Letters, Nanaimo News Bulletin, 777 Poplar St., Nanaimo, B.C. V9S 2H7
Fax: 250-753-0788
E-mail: editor@nanaimobulletin.com