Walter Volovsek: Retrospectives — Arrow Dam 10

Walter Volovsek: Retrospectives — Arrow Dam 10

Arrow Dam 10

Arrow Dam 10

The navigation lock was constructed with a crane mounted on a 90-foot mobile tower, being erected in this photo. A turntable base at the top will be mated to the 70-ton crane unit that has to be hoisted into place.

Walter Volovsek photo

Castlegar News